Route 232 in the Sa'ad-Tel Gama section
Route 232 in the Sa'ad-Tel Gama section
Project Description
- Rehabilitation and widening of Road 232 in the Sa'ad-Tel Gama section to a two-track two-lane road, following the events of October 7.
- Length – about 10 km.
- Construction of a separator at the Nova junction.
- Breakthrough 232 New Sin-Sa'ad Junction West to Alumim Junction.
- Separation of routes for the conservation of existing trees, about half of the route.
- Regulating access to agricultural roads along the entire route.
- Construction of a pedestrian crossing at the Sa'ad junction.
Additional Details
- Client name: Israel Highways.
- Project cost: 780 Million N.I.S.
- Services provided: Planning, construction management and supervision.
- Status: Statutory Planning Management.
