Pedestrian Bridge - Hadera Train Station
Paving and development - Pedestrian Bridge - Hadera Train Station
Project description:
- A steel bridge that connects the parking lot west of the tracks with the parking lot which is on the access road to the train station east of the tracks.
- The bridge passes over 5 railway tracks on the Tel Aviv-Haifa coastline.
- The bridge is built of 7 boxy spatial elements with a total length of about 70 meters and a width of 4.6 m,
with 3 commissioners. - Bridge driveway Composite ceiling - reinforced concrete ceiling cast on dedicated trapezoidal sheets.
- The bridge commissioners at the edges are made of steel and feature open staircases.
- Central Commissioner Reinforced concrete commissioner.
- Schedule for planning, statutory, tender, production and execution - 10 months.
More details:
- Customer name: Israel Railways.
- Financial scope: about NIS 6 million.
- Services: Planning management including statutory management, execution management and supervision.
- Status: Finished.