Energy Park Sewage Pumping Station

Energy Park Sewage Pumping Station 

 Special Infrastructure Works - Energy Park Sewage Pumping Station Hadera 


Project Description:
  • Sewage Pumping Station at a depth of 14 m inside the groundwater, including an upper structure.
  • Three main pumps with a capacity of 150 cubic meter per hour each.
  • The soil is characterized by a layer of water that closes to a depth of 4 meter, a thick clay layer to a depth of 12 meter, and below groundwater of the coastal aquifer.
  • Constructed a pressure pipe line and a gravity line under 5 railroads.
  • Sewage Pressure line - HDD drilling. 355mm tube inside 560mm sleeve.
    Length 120 m. Depth of 6 m.
  • Gravitation line - Spiral drilling. 400mm tube inside 800mm sleeve.
    Length 100 m. Depth of 8 m.
  • The Sewage Energy Park Pumping Institute is at a depth of 14 meter inside the groundwater including an upper structure.
Additional details:
  • Client: Hadera Municipality/Mey Hadera Corp.  
  • Project Cost: 20 million N.I.S.
  • Services provided: Planning & Construction Management and Supervision.
  • Status: Ended.

Call for more details
09-7665999
Or leave details and we'll get back to you soon!

Contact Us

Share by: