Special Infrastructure Works - Energy Park Sewage Pumping Station Hadera
Project Description:
Sewage Pumping Station at a depth of 14 m inside the groundwater, including an upper structure.
Three main pumps with a capacity of 150 cubic meter per hour each.
The soil is characterized by a layer of water that closes to a depth of 4 meter, a thick clay layer to a depth of 12 meter, and below groundwater of the coastal aquifer.
Constructed a pressure pipe line and a gravity line under 5 railroads.