Leveler Separation #21 - Hadera
Leveler Separation #21 - Hadera
Project Description:
- Construction a bridge over the railways on the Haifa-Tel Aviv coastline.
- Two parallel bridges with a length of 200 meter and a total width of 30 meter.
- Two ramps with a length of 400 m.
- Roads with a total length of 4 km.
- As part of the project, roads were upgraded in the Sela neighborhood,
renovated and expanded the access to the train station and upgraded to Shimoni Street. - Apartment Acoustic Treatment for over 100 apartments.
Additional details:
- Client: Ayalon Highway.
- Project cost: 80 Million N.I.S.
- Services: Planning Management including statutory plan, Execution Management and Supervision.
- Status: Ended.