Leveler Separation #21 - Hadera

Leveler Separation #21 - Hadera


Project Description:

 

  • Construction a bridge over the railways on the Haifa-Tel Aviv coastline.
  • Two parallel bridges with a length of 200 meter and a total width of 30 meter.
  • Two ramps with a length of 400 m.
  • Roads with a total length of 4 km.
  • As part of the project, roads were upgraded in the Sela neighborhood,
    renovated and expanded the access to the train station and upgraded to Shimoni Street.
  • Apartment Acoustic Treatment for over 100 apartments.

 

Additional details:

 

  • Client: Ayalon Highway.
  • Project cost: 80 Million N.I.S.
  • Services: Planning Management including statutory plan, Execution Management and Supervision.
  • Status: Ended.

 

Call for more details
09-7665999
Or leave details and we'll get back to you soon!

Contact Us